My Role:
1.Project Lead: As a lead, I was responsible of project planning and coordinating with the project guide
2.Design Calculations: Verifying design parameters with respect to thermodynamic stability of the silencer
3.3D Drafting: Drafting the 3-D model of the silencer
4.Material Procurement: Arranging the material for the prototype by coordinating with third party agency
5.Financial Feasibility: Handling the project finances
Aqua Silencer
Published:

Aqua Silencer

Published: