Tsim Sha Tsui/ Central MTR, Hong Kong
Venetian, Macau
Due to the brand's Asian expansion, design management and construction is needed.
DURATION 2 months
SCOPE OF WORK Client meeting, material and furniture proposing, design and construction drawings, site supervising