Ben Perry's profile

My Size Potty Pro

Value Engineering Project for Flagship Product: My Size Potty
Reverse Engineering, Design, Engineering, Manufacturability, Tooling Debug

Main considerations for this project were:
-Cannot compromise the styling and look for cost
-ASTM infant safety standards need to be constantly considered through design process.
-6 months to complete project in order to get item placed in store by the middle of 2023.
-Need to reduce plastic by at least 25% without compromising structure of product.
(By the end of the design, I was able to reduce the overall plastic weight by OVER 40%. This saved a lot of cost.)
My Size Potty Pro
Published:

My Size Potty Pro

Published: